Tooling checklist for tearing down the Equator parallel mechanism: torque wrench specs, strut support fixtures, joint pullers, cleaning agents, and records.
When dismantling a parallel structure of an Equator, it is often not the craftsmanship that truly sticks to the site, but the lack of three things: a support fixture that can safely support the mobile platform before starting, a specialized tool that can remove the ball joint from the taper hole without damaging the seat ring, and a set of measuring instruments that can prove that “putting it back is correct”. The 300 machine weighs 25 kg and the 500 machine weighs 74 kg, which are not heavy. However, the three linear drive struts only bear tension and compression, and do not bear bending moments. Any use of the wrong force point or pulling direction may turn a replacement into a structural component replacement.
The tooling list cannot be based on impressions. First, go through the movable object according to the component diagram (official installation and controller guide ID 132816300 is consistent with the 500 component diagram) to determine which object each tool corresponds to.
The official component drawing numbers are: 1. Base casting, 2. SP25 probe assembly, 3. Floating/moving platform, 4. Support strut, 5. Top casting, 6. Drive strut, 7. Balance weight mechanism, 8. Upper pivot/Hooke hinge, 9. Support arm, 11. Drive housing, 12. Parallel constraint mechanism, 13. Fixture plate, 15. Stop button.
The object is divided into three layers. The first layer, which can be moved and installed: probe assembly, probe module, fixture board, needle changing rack, cables – conventional tools are sufficient.The second layer requires support and release of constraints before it can move: the mobile platform, struts, and drive rods, with their connection points (upper pivot/Hooke hinge, ball joint) being pre tightened or interference fit, and the platform must be supported during disassembly. **The third layer is not within the scope of self built major repairs: the base and top seat castings, the counterweight balance mechanism, and the parallel constraint mechanism – the first two are load-bearing skeletons, and the internal structure of the counterweight mechanism is not officially disclosed. The parallel constraint mechanism determines the platform constraint form. Tools are purchased unreasonably, mostly by buying the first layer requirements as the second layer specifications, or fantasizing about moving to the third layer.
The three drive struts only bear tension and pressure, and do not bear bending moments, with Hooke hinges at both ends. The inference is straightforward: the platform posture is constrained by the coordinated length of three struts, and if any one of them is removed, the platform immediately loses more than one dimension of constraint; At this point, the other two forces are all pressing on their respective hinge points, and the direction is exactly the transverse shear that they are least good at.
So the first prerequisite for major repairs is not ‘having a puller’, but ‘having a supporting fixture that can hold the platform and fix the platform posture before dismantling the third one’. This also explains why the counterweight mechanism must be avoided as a whole: it is in working condition, and once manually intervened, the actual load distribution of each strut becomes unknown, and the disassembly and assembly records lose their meaning.
The grating is mounted on the strut, and the driving point and feedback point are of the same origin, which is an official design prerequisite. The consequences are practical: the strut and its accessories are measuring struts and are not allowed to be used as leverage points, clamping points, or pad contact points. Any tooling that applies clamping force on the strut (vise type table clamp, chain wrench, pipe clamp) is prohibited.
Even more concealed is the vibration. If the ball head is removed or pressed by tapping or punching, the vibration will be transmitted along the strut to the grating reading head, and the relative position between the reading head and the ruler surface may change at the moment of impact. After assembly, it may not immediately report an error, but may manifest as unstable zeroing and one-way deviation. Therefore, only spiral or hydraulic constant speed tools can be used for “pressing in”.
The indicators of 300 and 500 have a comparison uncertainty of ± 0.002 mm, not absolute accuracy. To be valid, three prerequisites are required: immediate measurement after re mastering, relative clamping deviation of parts to standard parts ≤ 1 mm, and the use of certified standard parts. Only Equator-X 500 provides absolute measurement indicators.
The significance of the list: Select the measuring fixture based on whether it can distinguish changes in the order of 2 μ m, not based on whether it has a scale. A steel ruler or inexpensive caliper with a division of 0.02 mm is completely ineffective at this level; A micrometer with a resolution of 1 μ m is sufficient because its purpose in the list is to detect changes. When it is necessary to adjust the deviation to within μ m and directly compare it with the order conclusion of ± 0.002 mm, a higher resolution (0.1 μ m level) micrometer should be replaced or handed over to a laser interferometer. The specific requirements in the official documents shall prevail.
| Nature | Definition | Typical Examples | What would happen if it were missing |
|---|---|---|---|
| Safety requirements | Not doing it cannot guarantee the safety of people and machines | Supporting fixtures, rigging, hanging and locking, anti-static | Personal injury or structural damage |
| Process requirements | Cannot be removed or reinstalled without doing it | Ball joint removal tools, pullers, torque wrenches | Tasks cannot be completed, and hard work can damage parts |
| Measurement is required | Not doing it cannot prove installation is correct | Standard ball, inspection rod, dial gauge, thermometer | Can be installed back, but the status cannot be clearly stated |
| Optional enhancement | Improve efficiency and traceability | Torque recorder, endoscope, label printer | Can be completed, weak traceability |
Classification determines procurement priority: safety, process, measurement, optional, not ranked by price, nor by “looking more professional”.
The official self maintainable items are very short: cleaning kit A-5504-9055 (including backup dust filter, prohibited cleaning agent), controller fan filter A-5696-0120 (12 piece set, replacement in high pollution environment for 6 months), probe inspection; There are no user repairable components inside the host and controller.
This sentence constrains users to self repair. The self built team is doing another thing: replacing and adjusting hinge points and support components under the premise of having fixtures and criteria, and then delivering the results to the calibration and verification party. The two are not contradictory, but the boundaries should be clearly stated: structural deformation, scratches on the linear encoder scale body, and situations that require original factory calibration or encryption upgrade packages and license migration are not covered by self built fixtures.
| Risk scenario | Physical reasons | Corresponding tooling | Consequences without tooling |
|---|---|---|---|
| Platform deflection during dismantling of struts | Three struts work together to constrain, losing one will cause instability | Supporting fixtures+horizontal adjustment | Remaining hinge points are sheared, resulting in looseness |
| The ball head is stuck in the taper hole and cannot be removed | After long-term pre tightening, the taper surface adheres | Ball joint removal tool and puller | Strike to remove, damaging the seat ring |
| Tightening too tight or too loose | No torque control | Torque wrench (correct range) | Thread slipping or insufficient pre tightening |
| Geometric deviation after reinstallation | pose change not retested | standard ball, inspection rod, dial gauge | deviation identified as machine error for troubleshooting |
| Assembly brings in particles | Grating and probe are sensitive to pollution | Dust free consumables, anti-static measures | Unstable zeroing, reading jump |
| Unstable lifting | High center of gravity, multiple prohibited pulling areas | Rigging, corner protectors, guide ropes | Deformation of protective covers, and collision of struts |
The five points are not suggestions, but criteria: if any one of them is not valid, the assignment will not begin.
1, Power outage and locking.It’s not about turning off the software or pressing the stop button, but about cutting off the main power supply (100-240 V AC ± 10%, 50/60 Hz, maximum 190 W/typical 80-100 W), then tagging and locking, with the key kept by the responsible person. Criterion: The switch is in the off position, labeled, locked, and the key is not on site.
2, Before releasing the transportation brake, the support must be in place first.The official description of “configuring braking devices for transportation” as a clear mechanical configuration action indicates that the platform does not self lock after the machine is powered off. If the machine is still in the transport lock state, the first thing to do is to record the status, install the supporting fixtures, and then release the lock; If the order is reversed, the platform will lose support at the moment of unlocking and rely on its own weight and weight to find the lowest position.
3, Venue and load-bearing capacity.300 whole machine weighing 25 kg (with an additional 27 kg), with an outer shape of 570 × 500 × 700 mm (with an additional height of 850 mm); The 500 unit weighs 74 kg (with an additional height of 75 kg) and has an outer shape of 1204 × 1139 × 1535 mm (with an additional height of 1685 mm). Criterion four: Load calculation based on the weight of the entire machine plus personnel and tools; Three or more directions can be approached; The clearance is sufficient for the dismantled strut to be placed flat; The ground is flat and not slippery. 500 requires confirmation of the lifting channel and clear height.
4, Two or more people with fixed division of labor.The criterion is not ‘someone next to you’, but ‘someone stabilizes the platform, someone exerts force, and roles are not interchangeable’. When the platform is “supported” rather than fixed, when a force is applied and the person supporting it instinctively resists, the direction cannot be predicted.
5, Before starting work, verbally confirm the prohibited areas.According to the official component diagram: drive strut, support strut, upper pivot/Hooke hinge, drive cover (orange cover), counterweight balance mechanism, parallel restraint mechanism. Do not use as a fulcrum, leverage point, clamping point, lifting point, or strike; Temporary supports, cushion blocks, and pull-out reaction points should all be outside the list.
| Preconditions | Criteria (can be checked) | When not met |
|---|---|---|
| Power outage and locking | The main power supply is disconnected, tagged, locked, and the key is kept by the responsible person | Do not start, do not unlock on behalf of others |
| Transport brake status confirmation | Status recorded; Unlock after the support is in place | Install the support first, then unlock |
| Venue and Load Capacity | Calculated by Weight and Personnel; Three directions can be approached; Adequate clearance | Change position or strengthen countertop |
| Two or more people with fixed division of labor | The stabilizer and the force applicator are separated and not interchanged throughout the process | Work will resume only when the person is in place |
| Confirmation of prohibited areas | Support rods, hinge points, shields, counterweights, and parallel constraint mechanisms have been excluded | Repositioning points |
The official public documents do not provide torque values for fixture plates, strut connections, and hinge seat fixation. Therefore, the specific values are subject to random documents or official technical support responses, and do not reference online empirical values. **How to choose the range? There are methods that are independent of numerical values.
The effective range is taken in the upper middle of the measurement range (a common practice in the industry).Falling at the bottom, the relative error of the indication is amplified; Falling at the top, the tool has a long-term limit load. The method is to first obtain the target value, and then select the range according to “the target value falls within 30%~70% of the full range”. The fastening points on the same device often span two orders of magnitude and should be equipped with two wrenches instead of one large stroke wrench.
Adjustable and preset (click type): adjustable for multi-point use; Single fixed point, batch repeated preset type, to avoid setting being mistakenly changed. Both require periodic calibration and traceability.
Actual torque=set torque x efficiency coefficient, the coefficient depends on the thread state, lubrication, gasket, and adapter; The universal joint and extension rod will significantly attenuate with angle, and the official has not given a coefficient, so they are not used for controlled fastening.
Record criteria: Record the point, set value, and tool number for each controlled tightening. No records equals no control.
The only officially available cleaning products are the cleaning kit A-5504-9055, which includes a backup dust filter and explicitly prohibits the use of cleaning agents.
This is the most easily overlooked because intuition is that ‘cleaning is always better than not cleaning’. On the contrary, solvents will leave residual films on the surfaces of optical and measuring components, or take away the original lubricating film, and the residual consequences far exceed dust. Therefore, the list does not include solvent based cleaning agents, degreasers, alcohol, or contact cleaning agents, only official kits and dust-free consumables.
In terms of thread glue, the official does not allow the use of specific points and strength grades. There are two common industry practices: low-strength detachable type (small fastening points used for repeated disassembly and assembly) and medium strength type (points that are no longer frequently disassembled after assembly); The high-strength permanent locking type is not suitable for parts that require maintenance. Criterion: * * Points with maintenance needs do not require high intensity; The amount of glue is limited to covering the threaded engagement section and should not accumulate outside the protruding thread. Excess glue will flow into the hinge gap or near the grating, and become a source of pollution after clumping.
It must also be clearly stated that no lubricant should be added to the interior of the strut and hinge point by oneself. **Ball joint dryness is a common phenomenon, but the official has not provided a lubricant model that can be self added. The industry’s common practice is to entrust this to the party with official information.
Grating resolution 0.0002 mm (300 and 500 data table apertures); The usage guide for 500 also states 0.00001 mm, with a difference of 20 times. The actual value should be based on the random file; X-500 is the absolute expression of RESOLUTE.At this resolution level, a 20 μ m dust particle entering the gap between the reading head and the ruler surface is equivalent to a disturbance of one tenth of the resolution; The consequence is that the reading jumps and returns to zero near a certain position, which is related to the position rather than continuous, and is easily mistaken for a problem with the strut or hinge point.
The criterion for probe deflection is ≤ 4 μ m.During scanning, the stylus is under controlled deflection; Particles are introduced at the connection of the probe or measuring rod, causing zero point drift and resulting in overall deviation after needle replacement.
The controller fan filter A-5696-0120 (12 piece set, replaced in high pollution environments every 6 months) is directly related to major repairs: the opening of the casing and exposure of the platform are the time windows when pollution is most likely to enter.
Anti static electricity is another risk: plastic parts, seals, cables, and connectors repeatedly rub and accumulate static electricity, which may discharge to the pins and damage them or cause the interface board to enter an abnormal state. The approach is three low-cost things – grounding the anti-static wristband to the equipment ground, placing anti-static pads on tools and disassembled parts, and discharging before disassembling connectors.
Standard ball: Is geometry still correct.Install at a known position and touch the same point in multiple directions to see if the center of the ball is consistent in all directions. The ball must come with a certificate – ‘using standard parts with certificates’ is one of the conditions for ± 0.002 mm to be valid.
Inspection rod: Check if the relationship between posture and axis is normal.Touch in different directions to check for straightness, perpendicularity, and repeatability; When the platform is installed off center or a certain hinge point is not in place, the reading shows a recognizable trend at both ends.
Micrometer/dial gauge: Check for displacement and looseness.The purpose is not to measure accuracy, but to measure “change”: to lightly push the platform on the surface to see if the pointer returns to zero; Check the displacement between the end of the strut and the seat ring. A resolution of 1 μ m is sufficient to detect assembly looseness.
Temperature gauge: Can the current data be used.Temperature is a prerequisite for interpreting data. The working temperature for English 06-A and usage guide is+5~+50 ° C, while for Chinese 04-A it is+10~+40 ° C (old version caliber, the following single version shall prevail); 500 is+5~+50 ° C. More importantly, the rate of change: The Equator-X 500 data sheet provides a temperature gradient of 2 ° C/h, 8 ° C/day, and absolute mode preheating for 2 hours.
| Stage | Main Actions | Main Tools | Completion Criteria |
|---|---|---|---|
| Preparation section | Power off locking, site layout, status recording | Tag lock, thermometer, record sheet | Check all five prerequisites |
| Dismantling section | Upper support, unlocking, dismantling periphery, hinge and strut | Supporting fixture, removal tool, puller, torque wrench | Components are complete, seat ring is undamaged, and identification is complete |
| Assembly section | Cleaning, replacement, installation of struts, installation of peripherals | Official cleaning kit, torque wrench, anti-static equipment | Sequential completion, torque recorded |
| Delivery section | Leveling, zeroing, probe inspection, positioning and needle changing rack, calibration and mastering, self inspection | Standard ball, inspection rod, dial gauge, thermometer | All self inspection gauges have judgment |
Step 1 | Power off, hang out, and lock.Exit the software, turn off the controller, and then disconnect the main power supply. The most prone to problems is “thinking it’s disconnected”: the interface unit (EZ-IO, referred to as EQ-IO in the interface unit manual), REN-IO, and automation connection lines may still have external circuit power supply, and must be disconnected or isolated together.
Step 2 | Record the current status.The pre overhaul state is the comparison after reassembly: mastering time point, probe deflection value (criterion ≤ 4 μ m), needle changing frame position, fixture plate hole usage, whether zeroing is normal, environmental temperature and humidity, and the latest accuracy record. Without these, it is impossible to distinguish between ‘restored’ and ‘already like this’ after reinstallation.
Step 3 | Site Layout and Load Calculation.Calculate the load capacity based on 25 kg (300) or 74 kg (500) plus personnel and tools; Three directions can be approached; The ground is not slippery; The clearance is sufficient for the support pole to be placed flat.
Step 4 | Prepare the receiving area.The removed strut and hinge seat are placed flat, separated, and labeled; The common practice in the industry is to place each item on a pallet, lay no velvet pads, and label the location (P/Q/R, upper/lower hinge end). The three struts have similar shapes, and after being installed in the wrong position, the geometric deviation is manifested as’ no matter how it is adjusted, it cannot be adjusted smoothly ‘.
Step 5 | Pre assembly and Inspection of Tooling.First, empty the supporting fixture once: ensure smooth contact, smooth support points, and high coverage of the platform position; Take out the tool and inspect the claw mouth, thread, and contact surface with the puller; Verify the validity period of the calibration label for the torque wrench.
Step 6 | Verbal confirmation before starting work.Read the list of prohibited areas once, confirm who stabilizes the platform, applies force, and records.
Safety reminder: After turning off the power, confirm that there are no residual movements before reaching out; Temporary power supply is not accepted after being tagged and locked; Clean the oil on the ground first, and the supporting fixtures on the wet and slippery ground will slowly move.
Step 7 | Install platform support tooling.The support point should be selected on the load-bearing surface of the platform (component diagram Floating/moving platform structural surface), and should not be placed near the probe assembly, stylus or grating. Adjustable pivot point adjusted to light touch (no pre tightening, no gap left) before locking. Criterion: When lightly pushing the platform, the pointer of the dial gauge at the fulcrum changes very little (industry practice: within the distinguishable range and without clearance), and then returns to its original position after releasing it.
Step 8 | Release the transport lock after the support is in place.The order cannot be reversed.
Step 9 | Remove the outer perimeter.Probe assembly, probe module, needle changing rack, fixture board, cable. The needle module should be selected according to the official sample to avoid pulling or pulling the measuring rod; The marking position of the needle changing frame and the base (Part 1 and Part 2 of EQR-6 positioning must be re executed after moving or disassembling); The fixture board is classified and placed according to the size of 305 × 305 mm for 300, 41 holes (M6/M8/¼ “, optional 441 holes), or 510 × 510 mm (M8 insert) for 500. The screws are numbered according to the hole position and put into the box. Disconnect the signal and interface cables first, and then disconnect the main power cord.
Step 10 | Clean the interface area.Only consumables from kit A-5504-9055 are used, and cleaning agents are prohibited. The purpose is to see the actual situation of the cone surface and seat ring and reduce the entry of particles into the mating surface.
Step 11 | Remove the ball joint.The core of the list. The reaction point must fall on the load-bearing surface of the outer edge of the seat ring, and must not fall near the strut, ball head, or grating; The direction is consistent with the axis of the tapered hole, and diagonal pulling will pull the seat ring into an ellipse. Criterion: Steady increase in force, no lagging or jumping; If there is a “click” sound and a sudden drop in resistance, it indicates that the contact surface has separated. At this time, reduce the force applied and slowly withdraw to avoid the ball head popping out. Take out the item and immediately place it in the designated location and take a photo.
Safety reminder: Wear an anti-static wristband throughout the entire process; No need for hammers, copper bars, or punches; The claw does not directly clamp the cylindrical surface of the strut (it may slip and scratch); Immediately cover the seat hole with a lint free cover after removal.
Step 12 | Disassemble the connecting end of the strut using a dedicated puller.The connecting ends of the strut and the drive rod are both at the hinge point, and at this point, the three rods are in a “supported” state rather than a free hanging state. The focus point is along the axis of the hole, and the reaction force falls on the seat ring. After removal, immediately mark it (P/Q/R).
Step 13 | Disassemble, count, and determine.Check the ball head and seat ring one by one for eccentric wear, indentation, and rust; Whether there are any bumps on the surface of the strut; Are there any traces of contamination in the grating area (which is the location for subsequent re examination). This judgment is the main basis for determining whether to replace or reuse, and it is the most expensive mistake to judge replacement parts based on their tactile feel.
Step 14 | Install the struts in reverse order.After supporting the platform with supporting fixtures, each piece must be installed with corresponding markings; Before installing each one, gently rotate it to confirm that there is no jamming, and then tighten it under control.
Step 15 | Controlled tightening.Record the set values and tool numbers point by point; The official has not disclosed the torque values at each point. The specific values are based on random files or official technical support, and other equipment experience values are not applicable. Tighten in two to three stages in diagonal/symmetrical order to avoid single point force causing the seat ring to deviate.
Step 16 | Reinstall the periphery.Reset the fixture plate screws to their original hole positions (otherwise the clamping reference will change); The action of reinstalling the needle changing rack to its original position is unreliable, and repositioning shall prevail; The probe and needle module are assembled according to the official sample specifications, and finally wired.
Step 17 | Remove the support fixture.After confirming that all three poles have been tightened and the platform constraints are complete, gradually release them.
Step 18 | Counting and visual inspection.Whether all the tools, wrenches, hexagonal inserts, and cushion blocks have been removed from the machine (leaving them inside is the most common source of secondary damage); Reset the protective cover and remove any clamping wires.
Step 19 | Final check before powering on.The stop button (300 for A-5504-0255500 for A-6078-0259) is effective, the protective cover is in place, the emergency stop circuit is normal, the connector has been reset, and the cable is not compressed. After powering on, check the self-test status first and do not rush to run the program.
The selection of lifting fixtures depends on three factors: weight grade, external dimensions, and the number of prohibited load-bearing parts.
The 300 machine weighs 25 kg, with a height increase of 27 kg, and has an outer shape of 570 × 500 × 700 mm (with a height increase of 850 mm). This level is mostly a “two person lift”, but it is not recommended to carry it directly by hand – the problem is not the weight, but the gripping position: the parts that are easy to grip are mostly the driving strut, supporting strut, and orange shield.
The 500 machine weighs 74 kg, with an additional height of 75 kg and an outer shape of 1204 × 1139 × 1535 mm (with an additional height of 1685 mm), which exceeds the safe handling range of human labor and must be transported by lifting equipment or forks. The difficulty lies in the coexistence of the height of the center of gravity and the height of the aircraft: the lifting height, channel height, and turning radius all need to be measured in advance, and the object of measurement is 1535 mm (with an additional height of 1685 mm).
The key criterion is “where is the load-bearing structure”: the load-bearing parts are integral castings such as base castings and top seat castings, as well as the positions reserved for lifting in the random documents (based on the official installation and controller guide ID 132816/107657). List of prohibited areas:
| Prohibited pulling/pushing/squeezing parts | Why can’t they withstand force | Common incorrect usage |
|---|---|---|
| Drive strut | Only bears tension and compression, not bending moment and lateral shear | When lifting the handle or supporting the pad |
| Support strut | Same as above, Hooke hinges at both ends | Use a rope to lift it from the middle |
| Upper pivot/Hooke hinge | The interior is a mating surface, and when subjected to lateral force, there is a displacement | Use your fingers to grip the hinge point and lift it |
| Drive cover (orange shield) | Protective component, not load-bearing component | Use the edge of the shield as a binding point |
| Weight balancing mechanism | in working condition, internal structure not disclosed | attempting to adjust or disassemble to ‘reduce weight’ |
| Parallel constraint mechanism | Determine platform constraint form | When the reaction point of temporary support |
| The deflection criterion for the probe assembly and stylus is ≤ 4 μ m, and slight force exceeds the tolerance. When lifting, press your hand on the probe |
Supporting fixtures (supporting platforms) and lifting fixtures (whole machine handling) cannot replace each other: the former should have high rigidity and be adjustable; The latter requires sufficient sling allowance and even corner protectors. Using supporting fixtures to lift machines or using slings as supports are two typical mixed use errors.
Horizontal adjustment: After positioning, adjust the level first and then turn on the power. The common practice in the industry is to use an adjustable foot and level gauge. First, roughly adjust the four corners, then retest the diagonal, and after two to three rounds, lock and recheck; The official leveling indicators have not been made public, and the random file shall prevail. Sequential leveling must be done after reassembly and before calibration, otherwise calibration will be based on the wrong pose, and all subsequent comparison results will carry this offset.
Some tools are considered standard in any mechanical maintenance, but are not recommended for use on parallel structured measuring machines; Because cheap is common, it is easiest to mix it into the list when purchasing.
| Tools | Common Uses | Why Not Use Here | Alternative Solutions |
|---|---|---|---|
| Hand hammer, copper rod, punch | Loose fitting parts | Impact transmitted along the strut to the grating reading head | Ball joint extraction tool, spiral puller |
| Pipe pliers, chain wrenches, vise type table clamps | Clamping cylindrical parts | Clamping force directly applied to the strut | Special fixtures for seat ring bearing force |
| Solvent based cleaning agents, alcohol, degreasers | Clean oil stains | Officially prohibited cleaning agents, residual consequences are heavier than dust | Cleaning kit A-5504-9055 |
| Adjustable wrench | Tightening | Uncontrollable torque, no visible slipping or insufficient pre tightening | Torque wrench (see section 2.2) |
| Ordinary lubricating grease and anti rust oil | Relieve dryness and abnormal noise | Official models that can be self filled are not provided | Hand over to the party with official information |
| Powerful pliers, pry bar | Pushing open the mating surface | Reaction point out of control, easy to hit the grating area or shield | Puller+seat ring bearing pad |
| Ordinary vacuum cleaner | Cleaning particles | Not anti-static, airflow may blow particles deeper | Clean air blowing, dust-free cloth |
| The multimeter probe directly tests the connector | Check the wiring | The probe is prone to supporting large pins, and there is a risk of live operation | Special test adapter (power-off measurement) |
The usage is not to memorize, but to compare and delete during procurement: if a tool appears on the left column of the list, simply cross it out and change it to the right column.
Having all the tools does not mean that they can be dismantled. The following five situations should not be handled by oneself even if there are fixtures.
1, Structural components are damaged.Casting cracks, strut collision deformation, and shield compression deformation can affect the restraint chain, and self correction is not feasible. Do not use gaskets to ‘retrieve’ it.
2, The linear encoder scale body is damaged.Surface scratches, abnormal gap between the reading head and the ruler surface, measurement value jumping and strongly correlated with position; The grating body is not a component that can be cleaned and repaired.
3, Original factory calibration or encryption upgrade package and license migration are required.Upgrade package encryption, version verification required; There are two forms of licenses: license key and USB dongle. License migration, version reinstallation, and calibration data writing exceed the coverage range of the tooling.
4, Functional verification after controller board level replacement.Third party professional maintenance can perform board level/component level repairs (power modules, driver boards, interface boards, connectors, fans and filters, storage media, cables), which is not contradictory to the official statement that “there are no user repairable components inside the controller” – the latter constrains users and not professional maintenance providers. Boundary three: If the warranty of the component is invalidated due to non original factory maintenance, it must be explained to the equipment owner; After repair, accuracy, safety, and license availability must be rechecked; In cases of structural deformation, scratches on the linear encoder scale body, and the need for original factory calibration or encryption upgrade packages and license migration, it is still recommended to return to the factory or take RBE.
5, When determining the qualified range.The conclusion of the major overhaul, whether it can be used or not, needs to be judged against the accuracy indicators. 300 and 500 have a comparison uncertainty of ± 0.002 mm, and all three prerequisites are indispensable; Only X-500 has absolute measurement capability (ISO 10360-2:2009: ± 2.1 μ m+L/300, 18-22 ° C; ± 2.6 μ m+L/180, 18-26 ° C; E0 repeatability MPL 1.2 μ m). The 300 and 500 data tables do not have an ISO 10360 chapter and cannot be judged as qualified using absolute indicators.
If any of the controller, probe, or needle changing frame is replaced during the overhaul period, or if the needle changing frame has been moved, EQR-6 positioning (Part 1 and Part 2) must be re performed after reinstallation, followed by calibration and mastering.
The verification after reinstallation is a chain with a dependent sequence, rising step by step from physics to data: Physical confirmation (platform can hold, strut is fastened, tool has been removed, cover reset) → Motion confirmation (power on self-test, zeroing, stop button is effective) → Probe confirmation (deflection within limits, needle replacement is normal) → * Geometric confirmation (standard ball, inspection rod, micrometer readings are consistent) → Correlation confirmation (calibration and mastering) → Data confirmation * * (repeatability and comparison results).
The significance of sequence lies in the efficiency of troubleshooting: calibrating the probe before it passes is equivalent to building a coordinate system on an uncertain basis, and all results thereafter cannot be explained; If there is an abnormality in geometry, calibration will be done, treating the geometry problem as a coordinate system problem and ‘fixing’ it. The next drift will come back.
| Serial number | Inspection item | Criterion | Record value | Judgment |
|---|---|---|---|---|
| 1 | Counting of tools and fixtures | Pulling and removing tools, wrenches, and pads from the site | Checking the number of items | Passed/Failed |
| 2 | Three pole assembly | P/Q/R identification corresponds, all three are controlled and tightened | Torque records at each point | Passed/Not Passed |
| 3 | Removal of supporting fixtures | Removal after fastening all struts | Removal time | Pass/fail |
| 4 | Shield and cable | Shield in place without deformation, cable without compression or pulling | Visual+manual | Pass/Do not pass |
| 5 | Stop button and emergency stop | Action is effective, circuit is normal (300 A-5504-0255/500 A-6078-0259) | Actual press | Passed/Failed |
| 6 | Power on self-test | Self check without alarm, no residual errors | Alarm text | Passed/Failed |
| 7 | Zero Return | Each axis returns to zero normally without any timeout noise | Zero Return Time | Passed/Failed |
| 8 | Leveling | According to the random file indicators, retest after locking the foundation | retest results | pass/fail |
| 9 | Probe deflection | ≤ 4 μ m (UCCServer Equator → Advanced → Equator Server → Coordinate Measuring Machine Controller → General → Probe deflection) | Deflection value | Passed/Failed |
| 10 | Needle Replacement and Needle Replacement Rack | EQR-6 Positioning Part 1/Part 2 Completed | Positioning Time Point | Passed/Failed |
| 11 | Standard ball retest | Multi directional touch testing of the same center of the ball, consistent directions | Readings in all directions | Passed/Not Passed |
| 12 | Inspection rod and dial gauge | There is no unilateral trend in straightness and perpendicularity; Lightly push the platform pointer back to zero | Trend record | Passed/Not Passed |
| 13 | Calibration and Mastering | Completed according to official procedures, meeting three prerequisites | Mastering time point | Passed/Not Passed |
| 14 | Single point repeatability | Approaching the same point and direction continuously 10 times, the range is comparable to the baseline | Range | Passed/Not Passed |
| 15 | First article comparison verification | Run existing program with certified standard parts, consistent with historical baseline | Deviation | Passed/Failed |
Items 1 to 5 are physical confirmations and are prerequisites for all other items; The ninth item is the quantitative criterion for the probe, with an official limit of 4 μ m. If it exceeds the limit, the probe and needle should be checked first, and geometric confirmation should not be entered; The 15th item is the final criterion, which is compared with the baseline and not with absolute numbers.
Mastering must be redone after major repairs. It establishes the correlation between standard parts and machine coordinate systems, while major repairs simultaneously change three dependent things: platform posture, fixture board clamping reference, and needle changing frame position.
The three prerequisites must be met simultaneously, otherwise ± 0.002 mm does not hold: measure immediately after re mastering; The clamping position difference of each part relative to the standard part is ≤ 1 mm; use certified standard parts.
A common misconception is that mastering is not about reprogramming. The former establishes relevant relationships, while the latter is another matter; Old programs do not need to be rewritten due to major repairs, unless there are changes in measurement features, clamping schemes, or tolerance interpretation.
Four comparison processes (official MODUS programming guide 5.5.1-5.5.4): no calibration, CMM calibration, calibration, and tolerance calibration. It is recommended to use a process with a standard parts certificate for the first verification after major repairs, which can separate the “machine status” from the “program correctness”.
The tools from the first five chapters are deduplicated here and arranged in order of assembly into a printable table. ‘Necessary’ refers to the inability to safely and completely replace the ball joint and strut level without it; ‘Optional’ refers to the ability to improve efficiency or traceability, with reasonable alternatives.
| Serial Number | Tool/Fixture | Purpose | Required/Optional | Alternative Solution |
|---|---|---|---|---|
| 1 | Main power lock and tag | Prevent accidental power transmission after power failure | Required | None (no substitute provided) |
| 2 | Platform support fixture (rigid, adjustable) | Support the platform so that the three struts can be disassembled one by one | Necessary | None (struts cannot be disassembled without support) |
| 3 | Level (frame or electronic) | Positioning leveling, foot rechecking | Required | Precision level ruler (accuracy reduced by one level) |
| 4 | Ball joint removal/pressing tool (seat ring bearing) | Take and place the ball head along the taper axis | Required | None (not recommended for tapping to remove) |
| 5 | Special Puller (Claw Mouth and Seat Ring Matching) | Remove the connection end between the strut and the drive rod | Required | Universal Two Claw Puller+Seat Ring Bearing Block |
| 6 | Torque wrench (small range) | Controlled tightening of small fastening points | Required | None (adjustable wrench not included) |
| 7 | Torque wrench (large stroke) | Fixture plate and support fastening | Required | None |
| 8 | Socket, hexagon socket, and Phillips wrench (according to actual screws) | Conventional tightening | Required | Single specification matched according to point position |
| 9 | Official cleaning kit A-5504-9055 | Grating area, probe exterior, platform cleaning | Required | None (cleaning agents are prohibited) |
| 10 | Clean cloth, clean air blowing, non-woven wiping stick | Particle removal on assembly surface | Required | Cleanroom grade wiping paper |
| 11 | Anti static wristband+anti-static pad | Connector and interface board protection | Required | Anti static gloves (second in effectiveness) |
| 12 | Non velvet dust cover | Platform exposure period coverage | Required | Temporary coverage with clean aluminum foil bag |
| 13 | Standard ball with certificate | Geometric verification, retest reference | Required | None (no certificate does not meet the prerequisite) |
| 14 | Inspection rod | Attitude, straightness, and perpendicularity inspection | Required | Calibrated cylindrical measuring rod |
| 15 | Dial gauge (1 μ m)+magnetic gauge holder | Measure displacement and looseness | Required | Lever type dial gauge |
| 16 | Temperature gauge (including trend recording) | Determine whether the data is in band | Required | Temperature and humidity recorder |
| 17 | Grid identification tray | Positioning of struts and hinges | Required | Grid part box+label paper |
| 18 | Camera and Record Sheet | Pre disassembly Status and Wear Morphology Record | Required | Paper Record+Hand drawn Location Map |
| 19 | Endoscope (small path, photographable) | View the interior and obstructed areas of the seat hole | Optional | Flashlight+reflector |
| 20 | Controller Fan Filter A-5696-0120 (12 piece set, replacement in high pollution environment every 6 months) | Replacement of intake filter during major overhaul | Optional | None (official consumables, replaced periodically) |
When purchasing, two things need to be done: replace the occupying items such as “according to actual screws” with the actual specifications of the machine (the 300 fixture board has 41 holes M6/M8/¼ “, optional 441 holes; 500 is an M8 insert, optional M6/¼ “); Ask about the delivery time for items 2, 4, and 5 first – they are the easiest to be improvised and also the most prone to accidents.
Three things are not on the hardware purchase order, but they are equally important as tools.
One is the record template. The fields of pre disassembly status, torque setting, positioning time point, deflection value, and ambient temperature were not prepared before the start of work, and the records added afterwards are not reliable.
The second is the component diagram. The official component diagram is the basis for determining the prohibited parts and load-bearing surfaces, and sticking an enlarged piece in the work area is more reliable than relying on memory.
The third is the division of labor and authorization list. Which issues should be handled by oneself, which should be handed over to the party with official information, and which should be returned to the factory according to official procedures, filled in before starting work, to avoid discovering that a certain step is not authorized halfway through the dismantling process.
Can partially replace, but cannot completely replace. The universal two claw puller has sufficient pulling force, but the problem lies in the reaction point and the shape of the claw mouth: the claw mouth will slide when clamped on the cylindrical surface of the strut, and once it slides, it will become inclined, and the seat ring is easily pulled into an ellipse. The feasible approach is to equip the Lamar with a seat ring bearing pad – the inner hole is slightly larger than the ball head, and the outer edge is in contact with the platform step, so that the reaction force falls on the bearing surface. Judgment criteria: The extraction process should have a stable force, no slippage, and no sudden lateral deviation; The operation of ‘holding the puller with your hand to prevent it from tilting’ indicates that the fixture is incorrect.
The official cleaning supplies are only kit A-5504-9055, and cleaning agents are prohibited. Oil stains are not replaced with stronger solvents, but are layered: floating dust and particles are removed using consumables and clean air blowing kits; The obvious oil pollution indicates that the pollution source is still present (seal failure, lubricant overflow, environmental fumes), and the pollution source should be treated and judged by a party with official information. Cleaning up just erases the evidence – oil stains appearing near the grating area are already clues that need to be traced.
Worth it, the usage needs to be changed. When the official value is not provided, the function of the torque wrench is not to “meet a certain standard”, but to be controlled and reproducible: using the same set value, the same tool, and recording for the same type of point. There are three values: the next disassembly can reproduce the previous state; If there is a problem, the variable of ‘inconsistent torque’ can be ruled out; After replacing the strut, there is no need to touch the remaining points again. Using an adjustable wrench to ‘feel in place’ does not have any of these three abilities.
When transporting the whole machine, 25 kg is within the range of two people’s joint force, but it is not recommended to move it directly by hand. The problem lies not in weight, but in the points of force: most of the positions that are easy to grip are the driving strut, supporting strut, and orange shield, which are not allowed to be subjected to force. The feasible approach is for two people to lift the load-bearing surface of the base and top seat castings, keeping the fuselage upright and not placed sideways; The elevated model weighs 27 kg and is 850 mm tall, with a higher center of gravity. When lifting, there should be a third person guide channel. The supporting fixtures during the overhaul period and the lifting fixtures for the entire machine are two separate things and cannot be replaced by each other.
It is sufficient to ensure that particles do not enter near sensitive areas and that disassembled parts do not detach from the same potential, without the need for a clean room. Three: Full coverage of the platform exposure period; Only official kits and cleaning consumables are used for cleaning, one use, one discard; Wear an anti-static wristband that is grounded throughout the entire process of connector operation, and place the disassembled parts and tools on anti-static pads. These three costs are very low, but they correspond to the stability of readings at the 0.0002 mm grating resolution level and the criterion of probe deflection ≤ 4 μ m – the cost of troubleshooting caused by a single pollution is much higher than the price of consumables.
Sure, but it must be installed according to the reassembly standard and cannot be ‘temporarily installed’. The criteria are: controlled tightening after the strut is reinstalled, removal of the supporting fixture at the specified position, complete platform constraints, and confirmation of normal power on self-test and zeroing according to items 5 to 7 of the self-test table. The most dangerous condition for long-term storage in a semi assembled state (with screws fastened, support removed, and protective cover not installed) is that the platform’s own weight and counterweight allow the unsecured connection points to continue to bear the load. After a few weeks, when they are taken out for use, the excess capacity has already been generated. If the complete state cannot be restored, keep it in its original state before disassembly.
I need it. The official requirement is to perform Part 1 and Part 2 of locating the EQR-6 rack after moving or replacing the machine. The reason is very direct: the position of the needle changing frame in the machine coordinate system is determined by software, and the actual position changes but the determination does not change, resulting in a deviation between the actual position of the stylus and the determined position. This deviation does not appear in the form of an alarm, but rather manifests as drift in the results before and after needle replacement, which can easily be misjudged as a problem with the probe or needle on site. During the overhaul period, if the needle changing frame or its base has been disassembled or moved, it will be considered as a frame replacement and will be repositioned according to official requirements for consistency verification.
Not even counting. Self inspection passing only indicates that the physical and electrical links are normal; Accuracy depends on data verification after calibration and mastering: items 1-14 pass, item 15 first piece comparison is comparable to the historical baseline before major repairs, and all three preconditions (immediate measurement after re mastering, relative clamping difference of parts to standard parts ≤ 1 mm, use of certified standard parts) are met simultaneously. It is recommended to shorten the retest interval in the first week after major repairs, as assembly issues often only become apparent after thermal stability.
The parameters of this article are quoted from official public documents: Equator 300 Data Sheet (H-5504-8251-06-A, 2026-02), Equator 300 Specification Manual (H-5504-8252-04-A), Equator 500 Data Sheet (H-6078-8310-01), Equator-X 500 Data Sheet (H-6620-8560-01-A, 2025-06), Equator Comparison Instrument User Guide (H-5504-8500), Equator Controller Technical Instructions (H-5504-4000-01-A), Equator Installation and Controller Guide (ID 132816/107657), Software Suite Guide (ID 134769/128229), EQ-IO Interface Unit Usage Guide (ID 124532), REN-IO Guide (ID 132155), Needle Sample (H-1000-3200-16-C/H-1000-3207-16-B).
The items with different official document calibers have been listed side by side in the main text: 300 working temperature (+5~+50 ° C for English 06-A and usage guide,+10~+40 ° C for Chinese 04-A), 500 grating resolution (0.0002 mm for data sheet and 0.00001 mm for usage guide), and needle changing rack model (the 300 data sheet only states the six digit needle changing rack, X-500 is clearly EQR-6300/500 according to the order configuration). The actual implementation of the following random file version shall prevail.
The torque values, leveling indicators, ball joint clearances and pre tightening forces, and ball joint lubricant models of each fastening point are not given in official public documents. Specific numbers are not listed in this article and are marked as “subject to random documents or official technical support”; The effective range of torque wrench, fine adjustment criteria for support points, strength grading of thread glue, and identification of component parts are industry practices and not official specifications. The case data has been desensitized.
Every Equator fault eventually comes down to a specific machine type, duty cycle and batch. The criteria and procedures in this article can be used as a shop-floor checklist; when something does not add up, talk to us directly:
| Item | Detail |
|---|---|
| Company | NINGBO JCE INDUSTRIAL TECHNOLOGY CO., LTD. (JCETech) |
| Address | Room 12B17, Building 2, Zone A, Ningbo R&D Park, Juxian Subdistrict, Hi-Tech Zone, Ningbo, Zhejiang 315048, P.R. China |
| Contact | Mr. Li / Mr. Zhang |
| Phone | +86 157-5780-7400 (Mr. Li), +86 132-2194-1413 (Mr. Zhang) |
| Online booking | jcetech.cn/contact |
Repair intake and on-site service are handled at the same address. Please call before shipping a unit so transport and scheduling do not have to be repeated.
Probe, tool setter and laser interferometer repair, calibration and on-machine measurement integration.
157-5780-7400 / 132-2194-1413
打开微信扫一扫,关注「宁波匠测」
获取维修进度查询与技术支持
打开企业微信或微信扫一扫
添加专属顾问,随时沟通