Base casting and mounting face checks for Equator: flatness measurement, foot bolt stress distribution, shim adjustment, and deformation thresholds.
The base of the Equator is a casting, not a granite base; The base and top casting together form the fixed frame of the entire machine, and the fitting state of the installation surface directly determines whether the pose calculation benchmark of the three drive struts is established. Conclusion: The level and fit of the installation surface can be measured and adjusted on site, which belongs to the repairable category; If cracks or permanent deformation occur in the casting body, it is not within the scope of on-site repair.
There are only three prerequisites for participating in the judgment: confirming that the structure is a casting rather than a stone, dividing “flatness” and “levelness” into two things, and excluding the four confusing terms of temperature deformation when making the judgment.
This article answers three practical questions: how to measure flatness, how to judge foot stress, and what degree of deformation can be salvaged.
The component diagram of the Equator Installation and Controller Guide (shared with numbers 132816300 and 500) provides a identifiable list: 1 Base casting, 2 SP25 probe assembly, 3 Floating/moving platform, 4 Support strut, 5 Top casting, 6 Drive strut, 7 Counterbalance mechanism, 8 Upper pivot/Hooke’s joint, 9 Support arm, 11 Drive housing, 12 Parallel constraint mechanism. Parallel constraint mechanism), 13 Fixture plate, 15 Stop button.
There are two places on this list that are directly related to this article. Firstly, both the base and top are named casting.The official did not write them as stone, welded parts, or profile splicing parts. The second part: In the figure, Support strut, Support arm, and counterweight balancing mechanism are listed simultaneously.The existence of these three indicates that the base casting is not just “placed on the ground”, it is also the end point of the force on the counterweight and support circuit, the difference between the weight of the motion platform and the counterweight, and ultimately falls onto the base through the support path.
Therefore, the installation surface of the base is not a random floor plan. It is also a reference for the force transmission interface, the lower end benchmark of the upper and lower hinge points, and the height relationship of the fixture plate; All three require its flatness and controllable fit, otherwise the length readings of the three rods are based on a reference that will float.
When explaining why parallel structures are necessary, a comparison was made: the traditional Cartesian structure relies on “large granite shafts/heavy castings” to ensure rigidity, but this approach precisely introduces hysteresis and inertia problems. This sentence is often pronounced backwards.
It refers to the structural characteristics of others, not the configuration of the local machine.The Equator wants to bypass the path of “relying on mass pile rigidity” and use closed parallel geometric constraints to obtain rigidity. So:
This directly affects the direction of fault diagnosis. The idea behind the granite base is that ‘the stone will not deform, so the deformation must be elsewhere’; The idea behind the casting base is that the casting can deform under abnormal loads and improper installation, so the installation surface and ground script are on the suspect list. The direction was judged wrong, and all subsequent checks were off track.
The most common conceptual confusion on site is treating these two as synonyms. The objects they describe are different, the measurement methods are different, and whether the same tool can be used for measurement is also different.
| Concept | Describe object | Relationship with gravity | Typical measurement method | Can it be measured on site |
|---|---|---|---|---|
| Levelness | Tilt of the plane as a whole relative to the geoid | Direct correlation | Level, electronic level, composite level | Ability, instrument and reading need to be confirmed first |
| Flatness | The degree to which a plane deviates from the ideal plane | Irrelevant | Only local approximations can be made, and the overall judgment requires measurement conditions | |
| Parallelism | Directional relationship between two planes (or planes and axes) | Independent | Requires simultaneous measurement of two elements | Extremely difficult on-site, only trend comparison is needed |
| Fit (contact rate) | The proportion of actual contact between two fitting surfaces | Unrelated | Coloring inspection (red lead), feeler gauge | Energy, belongs to qualitative or semi quantitative |
Why must they be separated: A surface can be horizontal but locally uneven, or flat but overall tilted. The former determines whether the feet can land simultaneously and whether the castings will be locked and deformed; The latter affects the assumption of counterweight and gravity direction. **Leveling only solves the latter.
By disassembling the installation surface, it can be divided into three parts, each corresponding to a different failure mode.
Element 1: Ground bearing and leveling.According to official data, the Equator 300 weighs 25 kg (27 kg for the raised type), 74 kg for the 500 (75 kg for the raised type), and the X-500 has a split structure – the main engine weighs 140 kg and the base weighs 50 kg, which are lifted and positioned separately. The total landing weight is considered based on the sum of the two. The landing weight of X-500 is much higher than 300, and the difference in load-bearing capacity on the same ground is nearly five times; The ground is not an ideal rigid body, and floor slabs, steel structure platforms, and spliced floors all have local deflection. When the load is insufficient, the machine itself is “stable”, but the ground slowly sinks or rebounds, manifested as a drift in readings over time.
Element 2: Foot contact surface.Is there true contact between each foot and the ground. The contact surface relies on the fit between the gasket and the leveling screw, not on tightening force. The direct consequence of poor contact is that the load is concentrated on a few feet, while the rest of the feet are nominally grounded, actually suspended or semi suspended.
Element Three: Distribution of Foundation Stress.After the force evenly distributed on the foundation is redistributed, the base casting is subjected to non-uniform constraints: some areas are pulled and some areas are lifted. The casting will not immediately break due to this force, but it will stabilize in a new equilibrium shape that is different from the shape calibrated at the factory.
This is the most counterintuitive and common installation surface issue: locking all four feet in order to be “tighter and more stable” often results in the opposite.
The reason is due to the hyperstatic constraint: when a rigid body with multiple support points is placed on an incompletely flat surface, theoretically only three points can be in contact at the same time. The fourth point is either suspended or pressed into contact with the surface, which is not an ideal rigid body. The result of the pressing is that the base casting and the ground deform simultaneously, and the distribution of deformation depends on the relative stiffness between the two. The greater the tightening force of the bolt, the greater the amount of forced deformation. The base casting “appears to fit” in the assembled state, but in reality, it is forced to fit, leaving assembly stress inside.
This stress has three consequences: the shape of the casting in the assembled state is different from that in the free state, and calibration is usually completed in the assembled state, with normal data in the short term; The stress slowly relaxes with temperature and time, and the geometric relationship drifts, manifested as’ no one has moved it, and the accuracy gradually changes’; Partial rebound after unloading, unable to return to its original position after moving or loosening the foundation.
Conclusion: The function of the foundation is “support+repeatable positioning”, not “clamping”.The correct approach is to use three-point positioning and auxiliary support from other points, with each foot only applying enough force to stabilize contact; The tightening method and torque value shall be subject to the official installation guide and contract.
There are two paths through which temperature affects the structure, both of which are easily confused with installation surface issues.
Path 1: Material line expansion.The casting expands and contracts as a whole with temperature changes, and the larger the scale, the greater the absolute change; When the temperature varies in different parts of the machine, the amount of expansion and contraction in different parts changes, and the geometric relationship changes. The data sheet of X-500 provides temperature conditions: temperature gradient of 2 ° C/h, 8 ° C/day, absolute mode preheating for 2 hours, and maximum temperature compensation of 2 ° C/h. The meaning of these numbers is: Even if the environment is changing, there is a limit to the speed of change, and exceeding the limit will exceed the compensation capability.
Path 2: Reassignment of assembly stress.The forced fitting stress mentioned in the previous section varies with temperature, and the expansion coefficient between the casting and the ground (or foundation gasket) is different. The restraining force is redistributed, and the deformation amount changes accordingly. The characteristic of this type of deformation is related to temperature history. Unlike a heat engine, a cold engine returns to a reproducible value after being shut down for one night and restarted.
The most critical distinguishing point between the two and the installation surface issue is repeatability: deviations caused by temperature are reproducible and recoverable after the temperature stabilizes; The deviation caused by installation surface stress still exists after temperature stabilization and varies at different “power on timing”. Chapter 3 provides on-site differentiation methods.
| Method | What is the main measurement | What can be given | What cannot be measured | Requirements for operation |
|---|---|---|---|---|
| Frame level/bar level | Local horizontal tilt | Relative tilt direction and bubble grid number | Flatness; Overall contour | need to know the instrument division value; Need to test at multiple points |
| Electronic level | Tilt angle | Numerical value (resolution based on the instrument) | Flatness; Absolute elevation | requires preheating and zero position check |
| Straight edge ruler with feeler gauge | Local straightness/height difference | feeler gauge thickness or gap | Large range shape; Internal indentation | The ruler itself must be straight; The contact force should be light |
| Marking method (micrometer/dial gauge) | relative height difference, surface contour | gauge reading difference | absolute height; Need benchmark | Need stable meter rack and clean benchmark |
| Flat panel and measuring block (equal height block) | Local equal height and contact points | Judging by transparency or feeler gauge | Whole surface flatness | Limited significance when the size of the flat panel does not match the machine |
| Coloring inspection (red lead/blue oil) | adhesion rate | distribution and density of contact spots | numerical flatness | coating should be thin and uniform; Need to clean up residues |
**The reading order is not to select one from left to right, but to determine the problem first: to determine the tilt, use a spirit level; to determine the surface roughness, use a ruler with a stopper or a gauge; to determine the adhesion, use a stopper and coloring; to determine whether the foot has introduced stress, only the data can be used.
The principle of a level is that a bubble (or electronic pendulum) follows the direction of gravity, and the reading reflects the inclination of the section where it is placed, not the shape of the entire surface.
There are five key points for practical operation. Firstly, the instrument should be placed in a rigid, clean, and burr free location, and readings placed on coating bubbles or bolt heads are meaningless.Secondly, multiple measurements should be taken, with at least two perpendicular directions at each end, using the same instrument to record readings and positions. Thirdly, it is important to distinguish the direction of the reading: which side the bubble is leaning towards is higher than that side, and do not rely on memory to determine.Fourthly, the zero position of the instrument itself needs to be confirmed first. Rotate the same instrument 180 ° in place at the same position for retesting. If the reading symbol is flipped and the absolute value is close, it indicates that the zero position is available; The difference is the zero position error of the instrument, which is a common practice in the industry. Fifth, measure after the temperature stabilizes. The cold instrument should be directly taken to the machine that has just stopped for measurement, and the numbers from the first ten minutes are unreliable.
The boundary must be clearly stated: The level cannot measure flatness. The readings at all four corners are qualified, but there is a high possibility of a depression in the middle. Using the level reading as a criterion for flatness is one of the most common misjudgments on site.
The method of making a watch is to mount the watch on a stable watch stand, with the meter head vertically (or as needed) touching the surface to be tested, moving the watch stand along the surface or pushing the workpiece on the surface, and swinging the reading needle. It measures the relative height difference.
Three prerequisites are indispensable. One is the reference: The watch stand must be supported on a real and reproducible reference, such as the fixture plate or flat plate of the machine itself, or a confirmed transition reference; If the watch stand is supported on the ground and the ground is vibrating, the reading is the vibration reading. The second is the path: The movement route determines what can be seen, the straight path looks at the undulations on the straight segment, the grid path looks at the shape of the surface, and the route should be clearly written in the record. **The third is the environment: the temperature of the meter and the workpiece should be consistent, and hands should not be held on the meter rack for a long time.
The most valuable application of the table making method is repeated comparison at the same position: measure the same set of points before and after leveling to see if the height difference has decreased and if the distribution has become symmetrical. The determination of whether the installation surface is distorted by stress relies on this relative change.
The foot stress itself cannot be measured (there are generally no strain gauges or calibration conditions on site), but its consequences have three observable manifestations, which constitute the criteria.
Performance 1: Suspended on one foot.The phenomenon is that a shim or adjusting screw of a certain foundation can be inserted with a feeler gauge between it and the lower surface of the base; Or gently push the corner with your hand (not powered on, confirmed safe), and you will feel a slight sinking. The cause is that the ground is locally low-lying, the gasket is not properly placed, or the fourth point is mistakenly adjusted to be suspended after three-point positioning. The solution is to add or adjust the gasket, reposition the three points, and not force the hard lock.
Performance 2: Diagonal tilt.The phenomenon is that the level reading often shows “one pair of diagonals is higher than the other pair of diagonals is lower”, and it still holds true when retested in a different direction; Or when performing a coloring test on the four feet, the contact spots are thick on the diagonal two and light on the diagonal two. The cause is that the foundation is forced to fit tightly, and the base casting is constrained to warp in the direction of torsion. The solution is to first loosen all the anchor screws, allow the casting to rebound, and re load according to the three-point positioning, rather than continuing to press down on the higher side.
Performance 3: Excessive twisting of screws.The phenomenon is star shaped cracks appearing on the paint surface of the anchor screw, the gasket being flattened and deformed, and pressure marks appearing under the bolt head; I feel that the unloading torque is abnormally high or low when removing the screw. The cause is that the tightening exceeds the reasonable range. The disposal is to replace the crushed gasket, check the bolts and threads, and reload according to the official installation guidelines. The danger of excessive twisting lies not in damaging the foundation, but in transmitting stress into the base casting.
How to distinguish these three from temperature deformation, using a simple operation sequence:
Divide the disposal into four levels first to avoid taking action at the wrong level.
| Position | Disposal object | Who will do it | Reversibility |
|---|---|---|---|
| First level | Cleaning, inspection, recording | User can do | Fully reversible |
| Second gear | Ground load assessment, gasket adjustment, and re leveling | Users can follow official guidelines | Reversible |
| Three levels | redistribution of foot force, improvement of base and ground fit | It is recommended to carry out under the guidance of a professional | partially reversible |
| Fourth gear | Casting cracks, permanent deformation, structural component replacement | Professional evaluation and maintenance | Re calibration required |
This article only discusses the boundary between the second and third levels, with the fourth level to be evaluated.The reason is in Chapter 4.
This step is the easiest to skip, but without a baseline, there is no evidence of ‘improvement’.
Why three-point positioning: Three points determine a plane. It is possible for three points to make contact at the same time, but for four points to make contact at the same time, the surface needs to be completely flat and rigid, neither of which holds true. Using three points to determine the plane and the fourth point as auxiliary support, the force transmission path is clear, and the casting is not forced to deform.
Belonging to the first category of repairable, it is the adjustment of the installation surface itself: repositioning at three points, adjusting the gasket, re leveling, and improving the local load-bearing capacity of the ground. The reason why this type is repairable is because it changes the relationship between the machine and the external world, and the geometric relationships inside the machine are not passive.
The judgment basis is simple: the repeatability data before and after leveling, the level reading, and the plug gauge result can all be compared in the same record. If the data shows unidirectional improvement and stability, it indicates that the problem lies on the installation surface.
When there are cracks in the base casting and top casting body, it belongs to the category that cannot be self treated. There are three reasons: first, cracks in castings are often accompanied by internal casting defects (porosity, shrinkage porosity, cold shut), and the visible line on the surface is only the result; The second is that repair methods (welding, bonding, metal filling) will change the local stiffness and stress distribution, and this area is the stress path of the three struts and the support circuit; Thirdly, the geometric relationships need to be reconfirmed after completion, and there is no such verification condition on site.
The correct disposal is to stop using, isolate, and seek professional evaluation.The evaluation includes the location and direction of the crack, whether it is on the stress path, the propagation trend, and its impact on the benchmark. Do not replace evaluation with the judgment of ‘one supplement can still be used’ – this is not a conservative or radical issue, but a question of ‘whether there are verification conditions’.
The second type that cannot be self treated is permanent (plastic) deformation. The difference between it and elastic deformation is whether it rebounds after unloading. Observable signs include: the shape does not return to its original state after releasing the foot; The distance between two points changes unidirectionally compared to historical records; The directional relationship between the platform and the fixture board remains at a fixed angle for a long time, and neither leveling nor re mastering can eliminate it.
The deformation of castings is difficult to repair on site due to reasons similar to cracks: what needs to be restored is the geometric relationship of the entire machine, which is determined by the relative positions of multiple components. Correcting one part without changing other relationships does not have available measurement and calibration conditions on site. The feasible path is to determine the disposal method after professional evaluation, rather than on-site self shaping.
The evaluation of structural components and the internal maintenance of controllers are two unrelated technical lines, but they are often mixed together.
The official statement regarding the internal components of the controller is’ There are no user service-oriented parts inside the controller. ‘This sentence restricts the user from repairing them themselves, and the official will handle them as a complete replacement part. Third party professional maintenance can perform board level/component level repairs, such as power supply, driver, interface modules, connectors, fans and filters, storage media, cables, etc. The specific scope is subject to the actual fault diagnosis conclusion, which is not contradictory to the official “users cannot repair on their own” – the official restrictions are on users, not professional maintenance parties. The official list of the internal board components of the controller has not been disclosed, and this article does not make any commitment to the replaceability of specific components.
But this ability does not extend to structural components: casting cracks, permanent deformation, geometric reconstruction that requires original factory calibration, belong to another category of problems. The three boundaries should be clearly stated at the same time: ① Non original repair will render the original warranty of the component invalid, and it needs to be explained to the user; ② After repair, it is necessary to re verify (accuracy, safety, license availability); ③ In cases of structural deformation, damage to the linear encoder scale body, and the need for original factory calibration or encryption upgrade packages and license migration, it is recommended to return to the factory or use official service channels.
Before doing it yourself, go through each item one by one:
|The meaning of answering ‘yes’ in question|
|:–|:–|
|Does the problem only occur between the machine and the ground (gasket, level, ground bearing)? |If there is only one layer, it can be processed within the second level range|
|After releasing the foot, does the level reading return to a reproducible state? |If it leans towards elasticity and forced deformation, it can be adjusted first; If not returned, evaluate according to permanent deformation|
|Have you observed star shaped cracks, rust seepage, or component misalignment on the paint surface? |If so, stop self processing and enter professional evaluation|
|Is the deviation still fixed after leveling and re mastering? |If it’s not an installation surface issue, proceed to structural evaluation|
|Does the data vary with temperature history, while the cooling and heating machines remain stable? |If so, first treat according to the environment and thermal stability|
|Are all actions performed in a power-off state? |If not, stop immediately (do not push or pull the platform while powered on)|
Leveling is not about ‘looking flat’, but about three sets of data being valid simultaneously. This form is recommended to be used on every site and filled out every time.
| Serial number | Record item | Record content | Criterion |
|---|---|---|---|
| 1 | Date and time | Including environmental temperature, humidity, and temperature changes in the past 24 hours | Record as a timestamp for subsequent comparisons |
| 2 | Model and configuration | 300/500/X-500, whether to add a higher model | Determine the comparability of all subsequent comparisons |
| 3 | Reference for overall and ground weight | 25 kg for 300, 74 kg for 500, 140 kg for X-500 host and 50 kg for base | Corresponding to ground load assessment |
| 4 | Ground conditions | Floor slab/steel platform/splicing floor/joint position | It must be clearly stated at which foot the joint falls |
| 5 | Level | Model, division value, measuring point position, readings in two vertical directions, retesting of 180 ° zero position result | Readings are subject to official installation guidelines and contracts |
| 6 | Full week inspection of feeler gauge | Fit status and insertable thickness of each foot | Auxiliary foot “contact not forced” |
| 7 | Gasket Record | Number, Thickness, and Replacement Date of Gaskets for Each Foot | Whole Set Record, Cannot Only Record Changes |
| 8 | Repeatability (same location) | Range and mean of each measuring point, one group before and after leveling | Comparison of same caliber before and after |
| 9 | Position consistency | Mean and range at different positions and heights | Focus on morphology rather than a single numerical value |
| 10 | Standard ball retest | If conditions are met, record the results | As an independent reference for geometric relationships |
| 11 | First piece measurement | Test the workpiece or standard part once according to the normal process | Confirm the availability of the entire process |
| 12 | Signature | Operator, reviewer, date | Form traceable records |
The actions and verification for leveling and finishing are the same set: retest the level, repeatability, standard ball, first piece, and fill in the form item by item. The three mandatory tasks refer to repeatability, standard ball retesting, and first piece measurement, each answering a different question.
The first item: repeatability.The answer is’ Is the machine still stable? ‘. The method is consistent with Chapter 2: measure a group continuously at a fixed position and take the range; Change several positions and test one group each. Judging from the form: The range at the same position has not been enlarged compared to before leveling, and the consistency between positions has improved, indicating that the forced deformation of the installation surface has been released.
Second item: Standard ball retest.The answer is’ Are geometric relationships still present? ‘. The standard ball provides a reference that is independent of the position of the fixture plate. If there is a systematic change in the measurement results of the ball before and after leveling, it indicates that the geometric relationship of the machine has been changed during the leveling process – this is not necessarily a bad thing in itself (it may have been wrong), but it is necessary to know what happened and update the re mastering benchmark accordingly.
Third item: First piece measurement.The answer is’ Can the entire process still be used? ‘. Run the complete process with actual workpieces, including clamping, measurement, and comparative analysis. This step cannot be omitted: if the repeatability is qualified and the geometric relationship is normal, there may still be problems in the clamping, temperature, and program stages, and these problems will only be exposed after running the entire process.
When writing the three items into the report, use the same sentence structure: “The range at the same position after leveling is a certain value, and before leveling is a certain value, both are within the same level”, only comparing oneself with oneself, without citing threshold values from unknown sources; The mean difference between positions is written as’ reduced from a certain value to a certain value ‘, indicating that the influence of the installation surface has been released; If there is a systematic change in the standard ball result, write ‘updated in the corresponding record’, acknowledge the active change and leave a trace, which is more credible than attempting to prove ‘no change’. Any threshold must be able to indicate the source: official installation guidelines, acceptance contracts, or user defined internal regulations (must indicate as internal regulations).
Sentence 1: “The range at the same position after leveling is X, and before leveling it is Y, both are within the same level” – This statement is safe and meaningful because it only compares itself to itself.
Sentence 2: “The mean difference between positions has decreased from A to B” – This indicates that the influence of the installation surface has been released, and the comparison is based on its own data.
Sentence 3: “The mean of the standard ball measurement results after leveling has systematically changed and has been updated in the corresponding records” – Admitting the active change and recording it is more credible than attempting to prove “no change”.
The wording to avoid is to provide a ‘qualified threshold’ without indicating the source. Any threshold must be able to indicate the source: official installation guidelines, acceptance contracts, or internal regulations defined by the user themselves (with an indication that they are internal regulations).
The installation surface is not permanently effective after one adjustment. The gasket will rust, the ground will settle, the machine will move, and the environment will change. The recommended cycle for re inspection is determined by the intensity of use and environmental conditions. The industry’s common practice is to use “leveling records+one repeated retest+one first piece” as a fixed re inspection package, with the cycle specified in the equipment management regulations of the executing party, and immediately executed once after moving the machine, changing the ground, changing the tooling, or experiencing accuracy drift.
**Leveling and re mastering after moving the machine are two separate things that cannot be replaced: leveling solves the relationship between the machine and the ground, while re mastering solves the relationship between standard parts and the machine coordinate system. Both of them need to be done, in the order of leveling first, confirming the geometry, re mastering, and finally the first piece.
A certain automotive parts supplier (anonymous due to customer confidentiality requirements) found an overall deviation in comparison results after moving an Equator 300 (with a total weight of 25 kg) into a new workshop, but the repeatability was good. On site inspection in the order described in this article: the ground is a spliced floor, and the joint is located directly below one of the foundation feet; Using a feeler gauge, it was found that the foot can be inserted into a thin feeler gauge, and the other foot diagonally can also be inserted; The level reading is diagonally higher. The disposal is to loosen all the feet, re lay the support at the joints, reposition the three points, load alternately, re level, and then re master and confirm the first piece. The retest showed a reduction in the mean difference between positions, and the first item passed. This type belongs to the typical first to second level disposal.
A 3C precision structural component factory (anonymous due to customer confidentiality requirements) had a fixed directional deviation on an Equator 500 (with a total weight of 74 kg) after two years of use, which persisted even after leveling and re mastering. Upon inspection, star shaped cracks were found on the paint surface of the foundation, and the gasket was crushed; Further examination revealed that the platform had decreased repeatability at specific locations. Disposal should follow the boundary layer principle in this article: stop self processing, conduct appearance and penetration screening first, then perform data extrapolation, and finally decide based on professional evaluation conclusions. This category has entered the fourth level and is only responsible for “determining direction” on site, not for “repair”.
The data of both cases are set according to industry confidence intervals and have undergone desensitization processing, and do not constitute a reference to specific equipment status.
No. The component diagram in the official installation and controller guide states that part 1 is labeled as Base Casting and part 5 is labeled as Top Casting, with the material diameter being the casting. The “large granite shaft/heavy casting” in the technical description refers to the traditional Cartesian structure relying on quality to ensure rigidity, and points out that this precisely introduces hysteresis and inertia problems. Writing granite on the machine base is a factual error and can directly cause the direction of fault diagnosis to deviate.
Not equal to. The level gauge measures the inclination of the placement location, which is related to the direction of gravity; Flatness measures the degree to which a surface deviates from an ideal plane, independent of gravity. A surface can be completely horizontal with a concave center and raised corners. In this state, the foot may be forced to adhere and the casting may be constrained to twist. The correct judgment is based on two independent conclusions: the level reading indicates tilt, while the feeler gauge and ruler with a dial gauge indicate local flatness and fit. Both should be noted. Using the level reading as a criterion for flatness acceptance is one of the most common misjudgments on site.
Because neither the ground nor the base is an ideal rigid body, the simultaneous contact of the four supports requires a completely flat surface and a completely rigid component. In reality, neither of them holds true. The result of forced locking is that the surface is pressed into contact, and the base casting and the ground deform together. The distribution of deformation depends on the relative stiffness between the two. The greater the tightening force, the greater the amount of forced deformation, leaving assembly stress inside. This kind of stress will slowly relax with temperature and time, manifested as’ no one has touched it, accuracy slowly changes’. The correct approach is to use three-point positioning and auxiliary support from other points, applying only enough force to stabilize the contact.
Relying solely on a level cannot do it; A ruler with a stopper can only provide partial clearance; The table method provides a relative height difference, provided that there is a reliable benchmark and a clear path. The combination of the three can make a local approximation judgment and a comparison before and after, but cannot provide the flatness value of the entire surface. When numerical judgment is required, flat plates and measuring equipment with measurement conditions should be used, or the official installation guidelines and acceptance methods specified in the contract should be followed. In practice, the wording is’ there is no gap where a feeler gauge can be inserted ‘instead of’ the flatness is qualified ‘, and the strength of the evidence for the two is completely different.
Observe repeatability and temporal patterns. The deviation caused by temperature is reproducible after temperature stabilization: both the cooling and heating machines have stable values at the same temperature, and when they return to that temperature, they return to that value, and the rate of change is related to the upper limit of the temperature gradient (2 ° C/h, 8 ° C/day) given in the X-500 data table. The deviation characteristics caused by installation surface stress are related to the timing of power on and temperature history, and do not return to the same value at the same temperature, and plug gauge inspection can detect suspension or diagonal warping. Perform a plug gauge and visual inspection first, and then enter the temperature and environment investigation after both are normal.
The order has four steps and cannot be reversed. The first step is to confirm the site and load-bearing capacity (including joint positions, nearby vibration sources, and airflow); The second step is to move according to the model when the power is off -300 people use the handheld position of the base casting, 500 can only be lifted mechanically, and 500 and X-500 have larger masses and are not allowed to be operated by a single person; The third step is to reposition the three points, level them, and confirm the entire circumference of the feeler gauge; The fourth step is to confirm the geometry and perform re mastering before conducting the first piece measurement. **Leveling and re mastering are two different things: the former concerns the relationship between the machine and the ground, while the latter concerns the relationship between standard components and the machine coordinate system, and cannot replace each other.
Divided into three layers. What can be saved: adjustment of installation surface, replacement of foundation gasket, re leveling, improvement of ground bearing capacity – these changes are related to the relationship between the machine and the outside, and the internal geometry of the machine has not been affected.Cannot move on its own: cracks, permanent (plastic) deformation, and structural damage in the base and top casting body. The reason is not difficulty, but the lack of verification conditions – after repair, it is necessary to reconfirm the geometric relationship of the entire machine, which is not available on site. **To distinguish clearly: board level/component level maintenance and structural component issues within the controller are two technical lines, and the capability boundary of the former does not extend to the latter.
Three must do tasks. One is Repetitive retesting: Continuously measure the range at a fixed position, change several positions to measure one group each, and see if the range at the same position is not magnified and the consistency between positions is improved. The second is standard ball retest: providing a reference that is independent of the position of the fixture plate, checking whether the geometric relationship has been changed during the leveling process, and updating the corresponding records if it has been changed. The third is first piece measurement: using actual workpieces to run the complete process, including clamping, measurement, and comparative analysis. Fill in three items of data into the same acceptance record form, indicating environmental conditions, tool division values, operators, and reviewers, to form a traceable record.
The technical parameters and structural dimensions of this article are quoted from the following official documents: Equator 300 Data Sheet (H-5504-8251-06-A, 2026-02 version), Equator 300 Specification Manual (H-5504-8252-04-A, Chinese), Equator 500 Data Sheet (H-6078-8310-01, ID 107491), Equator-X 500 Data Sheet (H-6620-8560-01-A, 2025-06 version), Equator Comparison Instrument User Guide (H-5504-8500, ID 145539), Equator Controller Technical Instructions (H-5504-4000-01-A, 2011-01 version), Equator Installation and Controller Guide (ID 132816/107657657). ().
The naming, part numbering, and relocation requirements for the base and top castings are referenced from the component diagram and installation chapter of the Installation and Controller Guide; The total weight of the machine is 25 kg/74 kg/main engine is 140 kg with a base of 50 kg, the temperature gradient is 2 ° C/h and 8 ° C/day, and the comparison uncertainty is ± 0.002 mm. The three prerequisites (measurement immediately after re mastering, clamping position difference ≤ 1 mm, and certified standard parts) are respectively quoted from the above data sheet and usage guide. There are currently no publicly available values for the allowable deviation of installation surface flatness, foot tightening torque, and allowable deviation after leveling. This article uniformly states that “official installation guidelines and contracts shall prevail” without inference. The zero position self-test, three-point positioning, and diagonal alternating loading of the level are common practices in the industry and are not official specifications. The two working conditions in the article are set according to industry confidence intervals and have undergone desensitization treatment, and do not refer to specific equipment or users.
Every Equator fault eventually comes down to a specific machine type, duty cycle and batch. The criteria and procedures in this article can be used as a shop-floor checklist; when something does not add up, talk to us directly:
| Item | Detail |
|---|---|
| Company | NINGBO JCE INDUSTRIAL TECHNOLOGY CO., LTD. (JCETech) |
| Address | Room 12B17, Building 2, Zone A, Ningbo R&D Park, Juxian Subdistrict, Hi-Tech Zone, Ningbo, Zhejiang 315048, P.R. China |
| Contact | Mr. Li / Mr. Zhang |
| Phone | +86 157-5780-7400 (Mr. Li), +86 132-2194-1413 (Mr. Zhang) |
| Online booking | jcetech.cn/contact |
Repair intake and on-site service are handled at the same address. Please call before shipping a unit so transport and scheduling do not have to be repeated.
Probe, tool setter and laser interferometer repair, calibration and on-machine measurement integration.
157-5780-7400 / 132-2194-1413
打开微信扫一扫,关注「宁波匠测」
获取维修进度查询与技术支持
打开企业微信或微信扫一扫
添加专属顾问,随时沟通